Lake Columbia Participants

Pre Construction Phase

Lake Columbia’s state water right permit authorizes a Firm Annual Yield of 85,507 acre-feet of water.  The Firm Annual Yield is the amount of water (in acre-feet) that the reservoir can produce on an annual basis for use by ANRA’s customers.  Pre-Construction Contracts, among other things, give participants the right of first refusal for construction phase activities.  The right of first refusal means that current participants will have an opportunity to enter into contracts for construction and operations of the reservoir before unallocated water is marketed to other non-participating entities.

Construction Phase

Once the reservoir receives its 404 permit from the U.S. Army Corps of Engineers, ANRA will offer contracts for construction and operation of the reservoir to its current list of participants. If, at the end of that contract offering period, surplus water remains unallocated, ANRA will market water to other entities in the region. It is ANRA’s desire that 100% of the water from the reservoir be sold to local entities.

Operations Phase

Lake Columbia participants will have a contractual right to use up to their contracted volume of water on an annual basis. As a result of their contractual right, participants pay their pro rata share of debt service to build the reservoir and ongoing annual operations & maintenance costs. Treatment and transmission alternatives will be developed after the construction phase contract offering period has ended and the list of participants is finalized.

Current Pre-Construction Participants

Conversions
An acre-foot is the volume of water that would cover one acre of surface area to a depth of one foot.
1 acre-foot equals: 325,851.429 gallons
1 million gallons equals: 3.07 acre-feet

Participant Percentage Acre/Ft Gallons/Year Gallons/Month Gallons/Day
Alto, City of 0.50% 427.5 139,312,891 11,609,408 381,679
Arp, City of 0.50% 427.5 139,312,891 11,609,408 381,679
Caro WSC 0.50% 427.5 139,312,891 11,609,408 381,679
Stryker Lake WSC 0.50% 427.5 139,312,891 11,609,408 381,679
Afton Grove WSC 1.00% 855.1 278,625,781 23,218,815 763,358.3
Blackjack WSC 1.00% 855.1 278,625,781 23,218,815 763,358
Jackson WSC 1.00% 855.1 278,625,781 23,218,815 763,358
New London, City of 1.00% 855.1 278,625,781 23,218,815 763,358
Rusk Rural WSC 1.00% 855.1 278,625,781 23,218,815 763,358
Cherokee County 3.00% 2,565.2 835,877,344 69,656,445 2,290,075
New Summerfield, City of 3.00% 2,565.2 835,877,344 69,656,445 2,290,075
Jacksonville, City of 5.00% 4,275.4 1,393,128,907 116,094,076 3,816,792
North Cherokee WSC 5.00% 4,275.4 1,393,128,907 116,094,076 3,816,792
Rusk, City of 5.00% 4,275.4 1,393,128,907 116,094,076 3,816,792
Troup, City of 5.00% 4,275.4 1,393,128,907 116,094,076 3,816,792
ANRA 10.00% 8,550.7 2,786,257,814 232,188,151 7,633,583
Nacogdoches, City of 10.00% 8,550.7 2,786,257,814 232,188,151 7,633,583
Whitehouse, City of 10.00% 8,550.7 2,786,257,814 232,188,151 7,633,583
Texas Water Development Board 37.00% 31,637.6 10,309,153,912 859,096,159 28,244,257
Total 100.00% 85,507.0 27,862,578,140 2,321,881,512 76,335,831